Automated Generation of 4D Building Information Models through Spatial Reasoning
- 17 May 2012
- conference paper
- Published by American Society of Civil Engineers (ASCE)
- p. 612-621
Abstract
Building information models (BIM), through their rich digital information content, have created an opportunity to automate portions of the estimating, scheduling, and visualization processes in construction management. In this research, we are developing a method that applies rule-based spatial reasoning based on the topological relationships between the building components in a BIM to automatically generate a technologically and physically meaningful construction sequencing of the building components while automating association of these activities with BIM objects for purposes of 4D schedule visualization. The spatial reasoning takes into account considerations such as structural construction, material layers and work access, some common construction practices and hierarchical relationships between the building entities. The methodology is applied to the domain of commercial construction projects.Keywords
This publication has 13 references indexed in Scilit:
- Improved link system between schedule data and 3D object in 4D CAD system by using WBS codeKSCE Journal of Civil Engineering, 2010
- Query Support for BIMs using Semantic and Spatial Conditions2010
- Design of Structural Elements2009
- Generation of a construction planning from a 3D CAD modelAutomation in Construction, 2007
- 4D dynamic construction management and visualization software: 1. DevelopmentAutomation in Construction, 2005
- Feasibility Study of 4D CAD in Commercial ConstructionJournal of Construction Engineering and Management, 2000
- Automated schedule generationCanadian Journal of Civil Engineering, 1998
- Scheduling with Computer-Interpretable Construction Method ModelsJournal of Construction Engineering and Management, 1996
- Sequencing Knowledge for Construction SchedulingJournal of Construction Engineering and Management, 1991
- Software needs for construction planning and schedulingInternational Journal of Project Management, 1986