Abstract
Battery Energy Storage System (BESS) models for reliability evaluation, as well as other power system simulation studies, are typically characterized by two key variables: State of Charge (SOC), representing the stored energy in MWh, and Injected Power (PB), indicating charging or discharging power in MW. These variables strongly depend on the operational role of the BESS within the system. Ideally, long-term time series data—spanning at least one year—from real installations would be available to support accurate modeling. However, due to the relatively recent deployment of BESS technologies, such data are often limited or unavailable. To address this limitation, this paper proposes a methodology for generating synthetic time series of SOC and PI for a specific BESS configuration and operational objective. The approach is based on a framework that determines the operation of the BESS to meet a predefined objective. The generated data is subsequently used to develop a BESS model suitable for composite reliability assessment using non-sequential Monte Carlo simulation.
Funding Information
  • Brazilian National Electric Energy Agency
  • Canarana Transmissora de Energia S.A.
  • Centrais Elétricas Brasileiras S/A—Eletrobrás
  • Centrais Elétricas do Norte do Brasil S.A.
  • Companhia Hidro Elétrica do São Francisco
  • Copel Geração e Transmissão S.A.
  • Costa Oeste Transmissão de Energia S.A.
  • Equatorial Transmissora SPE S.A.
  • Expansion Transmissão de Energia Elétrica S.A.
  • Expansion Transmissão Itumbiara Marimbondo S.A.
  • Horizon Transmissão ES S.A.
  • Horizon Transmissão MA I S.A.
  • Horizon Transmissão MA II S.A.
  • Marumbi Transmissão de Energia S.A.
  • Ourilândia do Norte Transmissora de Energia S.A.
  • Porto Primavera Transmissora de Energia S.A.
  • Serra Paracatu Transmissora de Energia S.A.
  • Uirapuru Transmissão de Energia S.A.

This publication has 14 references indexed in Scilit: