Abstract
This work outlines a procedure for integrating uncertainty and operational flexibility into open pit mine design selection. A multi-criteria design ranking system based on advanced uncertainty and financial modeling techniques such as Monte Carlo simulation and real options is proposed. A case study at a copper mine is provided.

This publication has 15 references indexed in Scilit: