Incorporating geological and market uncertainties and operational flexibility into open pit mine design
- 1 March 2011
- journal article
- Published by Pleiades Publishing Ltd in Journal of Mining Science
- Vol. 47 (2) , 191-201
Abstract
This work outlines a procedure for integrating uncertainty and operational flexibility into open pit mine design selection. A multi-criteria design ranking system based on advanced uncertainty and financial modeling techniques such as Monte Carlo simulation and real options is proposed. A case study at a copper mine is provided.Keywords
This publication has 15 references indexed in Scilit:
- A risk quantification framework for strategic mine planning: Method and applicationJournal of Mining Science, 2011
- Optimal life-of-mine scheduling for a Bauxite mineJournal of Mining Science, 2011
- Stope design and geological uncertainty: Quantification of risk in conventional designs and a probabilistic alternativeJournal of Mining Science, 2009
- Multi-period quarry production planning through sequencing techniques and sequencing algorithmJournal of Mining Science, 2008
- The new Fundamental Tree Algorithm for production scheduling of open pit minesEuropean Journal of Operational Research, 2007
- A maximum upside / minimum downside approach to the traditional optimization of open pit mine designJournal of Mining Science, 2007
- Valuing uncertain asset cash flows when there are no options: A real options approachResources Policy, 2005
- Decision Making Under Uncertainty—Real Options to the Rescue?The Engineering Economist, 2002
- When Are Real Options Exercised? An Empirical Study of Mine ClosingsThe Review of Financial Studies, 2002
- Valuing Managerial Flexibility: An Application of Real-Option Theory to Mining InvestmentsJournal of Environmental Economics and Management, 2001