Analyzing the risk factors of private–public partnerships for water supply projects using fuzzy synthetic evaluation: a case study of Iranian water supply projects
- 18 August 2017
- journal article
- research article
- Published by IWA Publishing in Water Supply
- Vol. 18 (3) , 1005-1019
Abstract
To compensate for the lack of funds for investment in private sector and infrastructure projects, governments may propose public–private partnerships (PPPs) to be able to use share capital and establish the necessary infrastructure of the country. The current study was undertaken to identify and determine the risk factors in PPPs for water supply projects in Iran. After identifying the risk factors using failure mode and effect analysis (FMEA), the risk priority number of each was assessed. This identified the most critical risk factors, which were then categorized into experimental, legal, financial, and technological subcategories. The fuzzy synthetic evaluation (FSE) technique and FMEA method were then blended and the FSE technique was modified for measuring the overall risk level. The computational results show that the levels of risk were ranked as follows (highest to lowest): financial, experimental, technological and legal. The level of risk in the financial subcategory was 6.11, in the experimental was 6.05 and in the technological and legal was 5.94 and 5.83, respectively. The overall risk level in PPPs for Iranian water supply projects considering linguistic variables as the criteria was 5.98, which is high. This level of risk confirms the applicability and suitability of the model.Keywords
This publication has 27 references indexed in Scilit:
- Risk analysis in ultra deep scientific drilling project — A fuzzy synthetic evaluation approachInternational Journal of Project Management, 2013
- Risk Allocation in Public–Private Partnership Infrastructure Projects in Developing Countries: Case Study of the Tehran–Chalus Toll RoadJournal of Infrastructure Systems, 2012
- Application of AHP FSE Method in the Network Course Quality EvaluationProcedia Engineering, 2011
- Risk criticality and allocation in privatised water supply projects in IndonesiaInternational Journal of Project Management, 2010
- A fuzzy synthetic evaluation embedded tabu search for risk programming of virtual enterprisesInternational Journal of Production Economics, 2008
- Public–private delivery of urban water services in AfricaProceedings of the Institution of Civil Engineers - Management, Procurement and Law, 2008
- Identifying risk factors of BOT for water supply projectsProceedings of the Institution of Civil Engineers - Water Management, 2008
- Analysis of groundwater quality using fuzzy synthetic evaluationJournal of Hazardous Materials, 2007
- A proposal for construction project risk assessment using fuzzy logicConstruction Management and Economics, 2000
- Tapping the Private SectorThe Journal of Structured Finance, 1998