Multi-mode resource constrained multi-project scheduling and resource portfolio problem
Authors:
- Umut BeşikciUBUmut Beşikci
- Ümit BilgeÜBÜmit Bilge
- Gündüz UlusoyGUGündüz Ulusoy
- 1 January 2015
- journal article
- research article
- Published by Elsevier in European Journal of Operational Research
- Vol. 240 (1) , 22-31
Abstract
No abstract availableKeywords
Funding Information
- Scientific and Technological Research Council of Turkey (TUBITAK-MAG 109M571)
- Bogazici University Scientific Research Projects (BAP-09HA302D)
This publication has 19 references indexed in Scilit:
- Resource dedication problem in a multi-project environmentFlexible Services and Manufacturing Journal, 2012
- A survey of variants and extensions of the resource-constrained project scheduling problemEuropean Journal of Operational Research, 2010
- A heuristic solution framework for the resource constrained (multi-)project scheduling problem with sequence-dependent transfer timesEuropean Journal of Operational Research, 2009
- A hierarchical approach to multi-project planning under uncertaintyOmega, 2007
- Project Scheduling—Theory and PracticeProduction and Operations Management, 2005
- Linear-programming-based heuristics for project capacity planningIIE Transactions, 2005
- A new efficient simulated annealing algorithm for the resource-constrained project scheduling problem and its multiple mode versionEuropean Journal of Operational Research, 2003
- Project Scheduling with Multiple Modes: A Genetic AlgorithmAnnals of Operations Research, 2001
- PSPLIB - A project scheduling problem libraryEuropean Journal of Operational Research, 1997
- Minimizing Resource Availability Costs in Time-Limited Project NetworksManagement Science, 1995