Review of the ordered and proportionate flow shop scheduling research
Authors:
- 3 January 2013
- journal article
- review article
- Published by Wiley in Naval Research Logistics (NRL)
- Vol. 60 (1) , 46-55
Abstract
Ordered flow shop models have appeared in the literature since the mid‐1970s and proportionate flow shop models have appeared since the early 1980s. We provide a detailed review of these models along with some analysis and potential topics for future research. © 2012 Wiley Periodicals, Inc. Naval Research Logistics, 2013Keywords
This publication has 61 references indexed in Scilit:
- Minimizing the number of tardy jobs on a proportionate flowshop with general position-dependent processing timesComputers & Operations Research, 2012
- A survey of scheduling with controllable processing timesDiscrete Applied Mathematics, 2007
- Hybrid flow shop scheduling: A surveyComputers & Industrial Engineering, 1999
- Job lateness in flowshops with setup and removal times separatedJournal of the Operational Research Society, 1998
- General flow-shop scheduling with resource constraintsInternational Journal of Production Research, 1988
- On Scheduling in a Semi-Ordered Flow Shop Without Intermediate QueuesA I I E Transactions, 1982
- On J -maximal and J -minimal Flow-Shop SchedulesJournal of the ACM, 1981
- Ordered Flow Shop Problems with no In-Process Waiting: Further ResultsJournal of the Operational Research Society, 1980
- A convex property of an ordered flow shop sequencing problemNaval Research Logistics Quarterly, 1977
- Optimal two‐ and three‐stage production schedules with setup times includedNaval Research Logistics Quarterly, 1954