Mooring System Transport and Installation Logistics for a Floating Offshore Wind Farm in Lannion, France
Open Access
- 22 September 2022
- journal article
- research article
- Published by MDPI AG in Journal of Marine Science and Engineering
- Vol. 10 (10) , 1354
Abstract
This study addresses the planning procedures for the installation of the mooring systems that support the floating offshore wind turbines in a wind farm. It considers the logistics of the installation process and discusses the important role of the weather windows in the planning of those operations at a preliminary stage of the project. The case study is based on a wind farm array of 47 Telwind floating wind turbine platforms, to be located in Lannion (France), with a potential of 470 MW. The study includes the transport and logistics requirements of different mooring components, such as chains, connectors and drag anchors; the description of the installation operations considering the typology of vessels that are necessary in these manoeuvres; as well as the planning and costs associated with the transport and installation. Given the diversity of elements and operations involved in the installation procedure, it is demonstrated that the research results of duration and costs of this type of operations are only possible to obtain using a simulation tool.Keywords
Funding Information
- Interreg Atlantic Area European Regional development fund (EAPA_344/2016, UIDB/UIDP/00134/2020)
- Portuguese Foundation for Science and Technology (EAPA_344/2016, UIDB/UIDP/00134/2020)
This publication has 41 references indexed in Scilit:
- Performance changes of a floating offshore wind turbine with broken mooring lineRenewable Energy, 2017
- Methodology to Calculate the Costs of a Floating Offshore Renewable Energy FarmEnergies, 2016
- High resolution local wave energy modelling in the Iberian PeninsulaEnergy, 2015
- Modelling and simulation of the operation and maintenance of offshore wind turbinesProceedings of the Institution of Mechanical Engineers, Part O: Journal of Risk and Reliability, 2015
- Advanced logistics planning for offshore wind farm operation and maintenance activitiesOcean Engineering, 2015
- Numerical evaluation of the wave energy resource along the Atlantic European coastComputers & Geosciences, 2014
- Analysis of measurements and simulations from the Hywind Demo floating wind turbineWind Energy, 2014
- GIS-based site selection methodology for hybrid renewable energy systems: A case study from western TurkeyEnergy Conversion and Management, 2013
- WindFloat: A floating foundation for offshore wind turbinesJournal of Renewable and Sustainable Energy, 2010
- Developing and applying a GIS-assisted approach to locating wind farms in the UKRenewable Energy, 2001