Quasi-optimal integrated production, inventory and maintenance policies for a single-vendor single-buyer system with imperfect production process
Authors:
- 22 June 2010
- journal article
- Published by Springer Nature in Journal of Intelligent Manufacturing
- Vol. 23 (4) , 1245-1256
Abstract
No abstract availableKeywords
This publication has 17 references indexed in Scilit:
- Simultaneous determination of production lot size and preventive maintenance schedule for unreliable production systemJournal of Quality in Maintenance Engineering, 2008
- An integrated production-inventory deteriorating model for pricing policy considering imperfect production, inspection planning and warranty-period- and stock-level-dependant demandInternational Journal of Systems Science, 2008
- An integrated production and preventive maintenance planning modelEuropean Journal of Operational Research, 2007
- An optimal policy for a single-vendor single-buyer integrated production–inventory problem with process unreliability considerationInternational Journal of Production Economics, 2004
- A simple integrated production policy of an imperfect item for vendor and buyerProduction Planning & Control, 2003
- Quality improvement and setup reduction in the joint economic lot size modelEuropean Journal of Operational Research, 2002
- The economic production lot-sizing problem with imperfect production processes and imperfect maintenanceInternational Journal of Production Economics, 2002
- A Production/Inventory Policy for an Unreliable Machine2001
- Economic Production Lot Size Model with Variable Production Rate and Imperfect QualityJournal of the Operational Research Society, 1994
- An Economic Order Quantity Model with Demand-Dependent Unit Production Cost and Imperfect Production ProcessesIIE Transactions, 1991