Abstract
The array of the corrector magnets of the LHC arc, associated with the main and some dispersion suppressor quadrupoles are powered by a special line routed inside the cryostat, running alongside the cold mass of the half‐cell. This line, composed of a 50 mm diameter stainless steel tube fixed to the cold mass, houses the superconducting multi‐wire cable(s) carrying the 600 A and 6 kA current to the corrector magnets and special quadrupoles. It is cooled down to 1.9 K with pressurized superfluid helium provided by links to the cold‐mass placed at regular intervals (one half‐cell). The paper is focused on the process of sub‐cooling the long channel from 4.5 K down to 1.9 K, including the propagation of the lambda front along the pipeline. The mechanism of sub‐cooling is based on a zone of phase transformation traveling along the channel, with the heat transport both in helium and in the copper wires. A new 2‐D model, including the radial heat exchange between copper and He II, has been used to study the process. A clamped temperature problem with a jump‐like variable section of the channel has been solved. The model has been applied to the analysis of recovery of the line after a quench in the main magnets. A comparison with the measurements in the LHC prototype cell (String 2) is shown.