Grouting-based treatment of tunnel settlement: Practice in Shanghai
Authors:
- Dong-Mei ZhangDZDong-Mei Zhang
- Zhong-Kai HuangZHZhong-Kai Huang
- Ru-Lu WangRWRu-Lu Wang
- Jing-Ya YanJYJing-Ya Yan
- Jie ZhangJZJie Zhang
- 1 October 2018
- journal article
- research article
- Published by Elsevier in Tunnelling and Underground Space Technology
- Vol. 80, 181-196
Abstract
No abstract availableKeywords
Funding Information
- National Natural Science Foundation of China (41772295, 51478344)
- Science and Technology Commission of Shanghai Municipality (16DZ1200403, 17DZ1203200)
- Science and Technology Project for Transportation and Construction in Western China (2013318J11300)
This publication has 26 references indexed in Scilit:
- Tunnelling and compensation grouting at Bond Street, LondonProceedings of the Institution of Civil Engineers - Geotechnical Engineering, 2015
- Investigation of the long-term tunnel settlement mechanisms of the first metro line in ShanghaiCanadian Geotechnical Journal, 2013
- Special lectures2012
- Research on structural status of operating tunnel of metro in Shanghai and treatment ideas2008
- Settlement behaviour of a shield tunnel constructed in subsiding reclaimed area2006
- Movements in the Piccadilly Line tunnels due to the Heathrow Express constructionGéotechnique, 2002
- The use of compensation grouting in tunnelling: a case studyProceedings of the Institution of Civil Engineers - Geotechnical Engineering, 2002
- Soil consolidation associated with grouting during shield tunnelling in soft clayey groundGéotechnique, 2001
- Immersed tunnel settlementsTunnelling and Underground Space Technology, 2001
- Immersed tunnel settlements. Part 1: nature of settlementsTunnelling and Underground Space Technology, 2001