The behavior of synchronous grouting in a quasi-rectangular shield tunnel based on a large visualized model test
Authors:
- Wenqi DingWDWenqi Ding
- Chao DuanCDChao Duan
- Yaohong ZhuYZYaohong Zhu
- Tianchi ZhaoTZTianchi Zhao
- Dezhong HuangDHDezhong Huang
- Peinan LiPLPeinan Li
- 1 January 2019
- journal article
- research article
- Published by Elsevier in Tunnelling and Underground Space Technology
- Vol. 83, 409-424
Abstract
No abstract availableKeywords
Funding Information
- National Aerospace Science Foundation of China (2014CB046905)
- National Natural Science Foundation of China (51378388)
- Shanghai Maritime University
This publication has 5 references indexed in Scilit:
- Study on inner force and dislocation of segments caused by shield machine attitudeTunnelling and Underground Space Technology, 2008
- Fall velocity of particles in shear flow of drilling fluidsTunnelling and Underground Space Technology, 2005
- Unified construction of running track tunnel and crossover tunnel for subway by rectangular shape double track cross-section shield machineTunnelling and Underground Space Technology, 2003
- Guidelines for the design of shield tunnel liningTunnelling and Underground Space Technology, 2000
- Alkali-activated cements Opportunities and challengesCement and Concrete Research, 1999