Identifying the Risk Impact on Cost and Time of the Egyptian Non-Residential Buildings Projects
Authors:
- 1 January 2020
- journal article
- research article
- Published by Technoscience Academy in International Journal of Scientific Research in Science, Engineering and Technology
- p. 01-12
Abstract
Construction projects in Egypt were typically influenced by multiple risk factors which have various impacts on both cost and time objectives that lead to project cost overruns and time delays. This paper presents the results of an investigation study concerns with the identification and assessment of risks associated with the Egyptian Non-Residential Buildings Projects (ENRBP). The study explores risk factors probability of occurrence and their effects on cost and time of these projects. A field survey was conducted with professionals in the construction projects in EGYPT for a purpose of collecting the required data of the risk factors characteristics. Based on results analysis, several risk factors were identified and categorized into fifteen risk groups as well as they were prioritized based on their effects on cost and time. A high agreement for ranking risk factors among contractors, consultants and owners was acquired. The list of the major risks included many factors such as: dramatic changes in the materials prices and Adopting direct attribution system rather than tendering and bidding systems. The most expected average increase of the cost overruns and time delays was more than 20% of the project planned budget and schedule. Finally, the analysis and findings showed that risk factors were very close in their impacts on both cost and time of ENRBP.Keywords
This publication has 16 references indexed in Scilit:
- Examining the role of value management in controlling cost overrun [application on residential construction projects in Egypt]Ain Shams Engineering Journal, 2019
- Identification and utilization of flexibility in non-residential buildingsEnergy Procedia, 2017
- Benchmarking Energy Use of Existing Hellenic Non-residential BuildingsProcedia Environmental Sciences, 2017
- Smart facades for non-residential buildings: an assessmentAdvances in Building Energy Research, 2015
- Evaluation of Non-Residential Green Building in Malaysia2015
- Evaluation of Sustainable Energy Options for Non-residential Buildings2014
- A Study on the Reference Building based on the Building Design Trends for Non-residential BuildingsJournal of the Korean Solar Energy Society, 2014
- Sustainable Renovation of Non Residential Buildings, a Response to Lowering the Environmental Impact of the Building Sector in EuropeEnergy Procedia, 2014
- Applying a Risk Management Process (RMP) to manage cost risk for an EHV transmission line projectInternational Journal of Project Management, 1999
- Research on construction industry development at the crossroadsConstruction Management and Economics, 1993