Abstract
A Brownian bridge of order q is the weak limit of a residual partial sum obtained from regression fitting. When q=0, the process is the usual Brownian bridge, and the distribution of the maximum is known analytically q≧1, the supremum distributions are approximated by a Monte Carlo technique. The theoretical results are tehn applied in two examples involving polynomial regression. Tables are given that allow a determination of the degree of regression fitting in the case of polynomial regression with autoregressive errors. This procedure is also a graphical procedure.