MILP models and valid inequalities for the two-machine permutation flowshop scheduling problem with minimal time lags
Open Access
- 22 October 2019
- journal article
- research article
- Published by Springer Nature in Journal of Industrial Engineering International
- Vol. 15 (S1) , 223-229
Abstract
No abstract availableKeywords
This publication has 20 references indexed in Scilit:
- The permutation flowshop scheduling problem with exact time lags to minimise the total earliness and tardinessInternational Journal of Operational Research, 2017
- A branch and bound algorithm to minimise the total tardiness in the two-machine permutation flowshop scheduling problem with minimal time lagsInternational Journal of Operational Research, 2015
- Minimizing total tardiness in the permutation flowshop scheduling problem with minimal and maximal time lagsOperational Research, 2014
- Upper and lower bounds for the permutation flowshop scheduling problem with minimal time lagsOptimization Letters, 2014
- Lexicographic optimization of a permutation flow shop scheduling problem with time lag constraintsInternational Transactions in Operational Research, 2013
- Permutation flowshop scheduling problems with maximal and minimal time lagsComputers & Operations Research, 2006
- Scheduling operations for the harvesting of renewable resourcesJournal of Food Engineering, 2005
- Single machine scheduling with chain: structured precedence constraints and separation time windowsIEEE Transactions on Robotics and Automation, 1996
- Shop Problems With Two Machines and Time LagsOperations Research, 1996
- Optimization and Approximation in Deterministic Sequencing and Scheduling: a Survey1979