Dynamic Simulation Model for Estimating In-situ Production Quantity of PC Members
- 29 April 2020
- journal article
- research article
- Published by Springer Nature in International Journal of Civil Engineering
- Vol. 18 (8) , 935-950
Abstract
No abstract availableKeywords
This publication has 23 references indexed in Scilit:
- Optimized rescheduling of multiple production lines for flowshop production of reinforced precast concrete componentsAutomation in Construction, 2018
- Optimized flowshop scheduling of multiple production lines for precast productionAutomation in Construction, 2016
- Automated quality assessment of precast concrete elements with geometry irregularities using terrestrial laser scanningAutomation in Construction, 2016
- A framework for dimensional and surface quality assessment of precast concrete elements using BIM and 3D laser scanningAutomation in Construction, 2015
- Causes and Penalties of Variation: Case Study of a Precast Concrete Slab Production FacilityJournal of Construction Engineering and Management, 2012
- Factors Affecting the Use of Precast Concrete Systems in the United StatesJournal of Construction Engineering and Management, 2008
- Process Model Perspectives on Management and Engineering Procedures in the Precast/Prestressed Concrete IndustryJournal of Construction Engineering and Management, 2004
- Constraint Programming Approach to Precast Production SchedulingJournal of Construction Engineering and Management, 2002
- Industrialized Building Systems Construction in MalaysiaJournal of Architectural Engineering, 2002
- Structural and Economic Benefits of Precast/Prestressed Concrete ConstructionPCI Journal, 2001