Teaching How To Use a Repetitive Scheduling Method When Planning a Green Condominium Building
Open Access
- 1 January 2019
- journal article
- Published by College Publishing in Journal of Green Building
- Vol. 14 (2) , 203-217
Abstract
This paper aims to present a methodology for use in construction planning named the Repetitive Scheduling Method (RSM). Students on a graduate level construction management program can learn how to create a RSM schedule to be applied to a real project. Typically, the Critical Path Method (CPM) is used to plan general construction projects. This paper presents a case study wherein a CPM diagram is transformed into a RSM schedule for use in the construction of a green condominium. RSM is the most suitable tool for planning repetitive projects like condominium buildings, apartment complexes, or real estate development projects. It utilizes an uninterrupted flow of resource concept in order to eliminate manpower-related resource wastage. As a result, construction productivity can be improved by using the right construction planning tool on the right project. Interested graduate students researching construction engineering can apply RSM on their repetitive projects in the future.Keywords
This publication has 3 references indexed in Scilit:
- Repetitive Scheduling Method: Requirements, Modeling, and ImplementationJournal of Construction Engineering and Management, 2016
- Scheduling Projects with Repeating ActivitiesJournal of Construction Engineering and Management, 1998
- Line‐of‐Balance Scheduling in Pavement ConstructionJournal of Construction Engineering and Management, 1986