Abstract
The introduction of the free PPP solution by the BDS-3 system and its published applications offers a feasible opportunity to conduct surveying tasks without the need to establish base stations. This paper examines the accuracy of the free PPP solution using a standard receiver integrated with this functionality to verify the technical specifications published in its documentation. The study utilises a ComNav N3 receiver to collect coordinate data from the PPP and near-baseline single-base RTK solutions for accuracy assessment. The results indicate that parameters such as the time to achieve a fixed solution and the reported accuracy align closely with the technical specifications. Additionally, the determination of relative distances and height differences between points in the designed experiment shows equivalence between the PPP solution and the RTK solution.

This publication has 13 references indexed in Scilit: