Automatic generation control of a large hydropower plant with head‐sensitive forbidden and restricted zones
Authors:
Open Access
- 26 February 2020
- journal article
- research article
- Published by Institution of Engineering and Technology (IET) in IET Renewable Power Generation
- Vol. 14 (7) , 1113-1123
Abstract
Head‐sensitive forbidden and restricted zones of large hydropower units are challenging the automatic generation control (AGC) as admissible operating zones are discontinuous and variational. This study focuses on the AGC of such a large hydropower plant to ensure the stability, security and timeliness of power grids. A methodology is developed to solve the unit commitment (UC) and load distribution in AGC. This methodology identifies in advance all feasible unit combinations under different water heads and determines admissible operating zones using combinatorial mathematics techniques. A fast strategy that includes the accurate estimation of varying water heads helps to eliminate infeasible unit combinations. Minimising the number of units working in restricted zones and times of unit output passing through forbidden zones is used to optimise the UC, where priority orders of units are introduced to evaluate UC schemes with the same objective value. Finally, a dynamic programming based model is formulated to solve an economic load distribution among operating units. The methodology is applied to the AGC of the Nuozhadu with nine 650 MW units of two different types. Three cases indicate that the number of units working in restricted zones and times of unit output passing through forbidden zones is significantly reduced.Keywords
Funding Information
- National Natural Science Foundation of China (51579029)
- Ministry of Water Resources ([2018]KJ09)
- Fundamental Research Funds for the Central Universities (DUT19JC43)
This publication has 23 references indexed in Scilit:
- Finding Multiple Optimal Solutions to Optimal Load Distribution Problem in Hydropower PlantEnergies, 2012
- Short-Term Scheduling for Large-Scale Cascaded Hydropower Systems with Multivibration Zones of High HeadJournal of Water Resources Planning and Management, 2012
- Comparison of particle swarm optimization and dynamic programming for large scale hydro unit load dispatchEnergy Conversion and Management, 2009
- Solving unit commitment problems with general ramp constraintsInternational Journal of Electrical Power & Energy Systems, 2008
- Application of fuzzy logic for load frequency control of hydroelectrical power plantsEnergy Conversion and Management, 2007
- Price-Based Unit Commitment: A Case of Lagrangian Relaxation Versus Mixed Integer ProgrammingIEEE Transactions on Power Systems, 2005
- Unit commitment of single hydroelectric plantElectric Power Systems Research, 2005
- A genetic algorithm for solving the unit commitment problem of a hydro-thermal power systemIEEE Transactions on Power Systems, 1999
- Integrating genetic algorithms, tabu search, and simulated annealing for the unit commitment problemIEEE Transactions on Power Systems, 1999
- Application of operations research in automatic generation control of hydropower plantsIEEE Transactions on Energy Conversion, 1989