The optimal number of used machines in a two-stage flexible flowshop scheduling problem
- 8 August 2013
- journal article
- Published by Springer Nature in Journal of Scheduling
- Vol. 17 (2) , 199-210
Abstract
No abstract availableKeywords
This publication has 26 references indexed in Scilit:
- Scheduling unrelated parallel machines with optional machines and jobs selectionComputers & Operations Research, 2012
- Minimizing the number of machines for minimum length schedulesEuropean Journal of Operational Research, 2009
- Scheduling with subcontracting optionsIIE Transactions, 2008
- Minimizing flow-time on a single machine with integer batch sizesOperations Research Letters, 2005
- Parallel machine selection and job scheduling to minimize machine cost and job tardinessComputers & Operations Research, 2005
- A note on flow-shop and job-shop batch scheduling with identical processing-time jobsEuropean Journal of Operational Research, 2005
- Batching in a two-stage flowshop with dedicated machines in the second stageIIE Transactions, 2004
- Sequencing a hybrid two-stage flowshop with dedicated machinesInternational Journal of Production Research, 2002
- Flow shop and open shop scheduling with a critical machine and two operations per jobEuropean Journal of Operational Research, 2000
- Optimal two‐ and three‐stage production schedules with setup times includedNaval Research Logistics Quarterly, 1954