Two hybrid flow shop scheduling lines with assembly stage and compatibility constraints
Open Access
- 21 June 2024
- journal article
- research article
- Published by Public Library of Science (PLoS) in PLOS ONE
- Vol. 19 (6) , e0304119
Abstract
Two hybrid flow shop scheduling lines must be coordinated to assemble batches of terminated products at their last stage. Each product is thus composed of two jobs, each produced in one of the lines. The set of jobs is to be processed in a series of stages to minimize the makespan of the scheduling, but jobs forming a product must arrive at the assembly line simultaneously. We propose a mixed integer linear programming model. Then, based on the model, we propose a pull-matheuristic algorithm. Finally, we present two metaheuristics, a greedy randomized adaptive search procedure and a biased random key genetic algorithm, and compare all the methodologies with real-based instances of a production scheduling problem in the automobile manufacturing industry. The greedy algorithm yields high-quality solutions, while the genetic one offers the best computational times.Keywords
This publication has 44 references indexed in Scilit:
- Minimizing the makespan and carbon emissions in the green flexible job shop scheduling problem with learning effectsScientific Reports, 2023
- Research on multi-objective optimal scheduling considering the balance of labor workload distributionPLOS ONE, 2021
- A DNA algorithm for the job shop scheduling problem based on the Adleman-Lipton modelPLOS ONE, 2020
- Multi-population genetic algorithm with ER network for solving flexible job shop scheduling problemsPLOS ONE, 2020
- Research on multi-agent genetic algorithm based on tabu search for the job shop scheduling problemPLOS ONE, 2019
- Bi-Objective Flexible Job-Shop Scheduling Problem Considering Energy Consumption under Stochastic Processing TimesPLOS ONE, 2016
- A novel genetic algorithm for the hybrid flow shop scheduling with parallel batching and eligibility constraintsThe International Journal of Advanced Manufacturing Technology, 2014
- Flow Shops and Flexible Flow Shops (Deterministic)2011
- Using ant colony optimization to solve hybrid flow shop scheduling problemsThe International Journal of Advanced Manufacturing Technology, 2007
- Optimal two‐ and three‐stage production schedules with setup times includedNaval Research Logistics Quarterly, 1954