Exploring Different Alert Limit Strategies in the Maintenance of Railway Track Geometry
- 1 September 2016
- journal article
- Published by American Society of Civil Engineers (ASCE) in Journal of Transportation Engineering
- Vol. 142 (9)
Abstract
This paper explores a quantitative model with different maintenance strategies to control railway track geometry degradation in Portugal. The alert limits put forward by the international standards are assessed regarding the planned and unplanned impacts associated with those limits, namely preventive maintenance and renewal costs, corrective maintenance costs, planned infrastructure delays due to changes in the maximum permissible speed, and unplanned infrastructure delays due to temporary speed restrictions. The effects of different choices for the alert limits of the main quality indicators for railway track geometry are assessed, considering a cost penalty due to delays set by the regulatory entity. Finally, a sensitivity analysis is conducted on the effect of this delay cost penalty on the optimized choice of the alert limits for both quality indicators.Keywords
This publication has 19 references indexed in Scilit:
- Hierarchical Bayesian modelling of rail track geometry degradationProceedings of the Institution of Mechanical Engineers, Part F: Journal of Rail and Rapid Transit, 2013
- Prediction of railway track geometry deterioration using artificial neural networks: a case study for Turkish state railwaysStructure and Infrastructure Engineering, 2013
- Heuristic Analysis of the Effective Range of a Track Tamping MachineJournal of Infrastructure Systems, 2012
- Integer Programming to Optimize Tamping in Railway Tracks as Preventive MaintenanceJournal of Transportation Engineering, 2012
- Comprehensive Decision Support Framework for Strategic Railway Capacity PlanningJournal of Transportation Engineering, 2011
- A Heuristic Approach to the Railroad Track Maintenance Scheduling ProblemComputer-Aided Civil and Infrastructure Engineering, 2011
- Biobjective Optimization Model for Maintenance and Renewal Decisions Related to Rail Track GeometryTransportation Research Record: Journal of the Transportation Research Board, 2011
- Scheduling preventive railway maintenance activitiesJournal of the Operational Research Society, 2006
- Optimizing Policies of Railway Ballast Tamping and RenewalTransportation Research Record: Journal of the Transportation Research Board, 2006
- Rail Track Maintenance Planning: An Assessment ModelTransportation Research Record: Journal of the Transportation Research Board, 2000