A modified MBR system with post advanced purification for domestic water supply system in 180-day CELSS: Construction, pollutant removal and water allocation
- 1 September 2018
- journal article
- research article
- Published by Elsevier in Journal of Environmental Management
- Vol. 222, 37-43
Abstract
No abstract availableKeywords
Funding Information
- Foundation of National Key Laboratory of Human Factors Engineering (HF2013-Z-A-01, SYFD170051808K)
This publication has 19 references indexed in Scilit:
- Non-methane hydrocarbons in a controlled ecological life support systemChemosphere, 2018
- Assessing the feasibility of two hybrid MBR systems using PAC for removing macro and micropollutantsJournal of Environmental Management, 2017
- Production of demineralized water for use in thermal power stations by advanced treatment of secondary wastewater effluentJournal of Environmental Management, 2017
- Research on regulating technique of material flow for 2-person and 30-day integrated CELSS testActa Astronautica, 2014
- Removal of emerging trace organic contaminants by MBR-based hybrid treatment processesInternational Biodeterioration & Biodegradation, 2013
- Key ecological challenges for closed systems facilitiesAdvances In Space Research, 2013
- The water cycle in closed ecological systems: Perspectives from the Biosphere 2 and Laboratory Biosphere systemsAdvances In Space Research, 2009
- Feasibility study on petrochemical wastewater treatment and reuse using submerged MBRJournal of Membrane Science, 2007
- New option of MBR-RO process for production of NEWater from domestic sewageJournal of Membrane Science, 2006
- Biosphere 2 test module: A ground-based sunlight-driven prototype of a closed ecological life support systemAdvances In Space Research, 1992