Abstract
The Krekeh Dam project is being developed to provide flood control and irrigation. To enable construction, a diversion tunnel is planned to temporarily redirect river flow. A critical part of the preparation is the slope stability analysis of the diversion tunnel’s inlet portal, which will serve as the starting point for tunnel excavation. This study evaluates slope stability using the Limit Equilibrium Method (LEM), specifically the Morgenstern–Price and Spencer methods, under both static and pseudo-static loading conditions, using Rocscience Slide software. The analysis comprises core drilling investigations, rock mass classification, laboratory testing, and the stability assessment of the inlet slope. Rock mass quality, assessed using the Geological Strength Index (GSI), indicates that tuff breccia has poor quality (25), whereas tuffaceous sandstone with intercalated siltstone and tuff ranges from fair to good (43.20–73.75). Initial LEM results show that the original design does not meet the minimum safety factor requirements specified in SNI 8460:2017 for either loading scenario. After redesigning the inlet slope, the safety factor values under both static and seismic conditions, demonstrate that the slope is now stable. This research provides valuable guidance for risk mitigation and engineering design in tunneling projects located in geologically complex environments.

This publication has 3 references indexed in Scilit: