New scheduling rules for a dynamic flexible flow line problem with sequence-dependent setup times
Open Access
- 19 January 2017
- journal article
- research article
- Published by Springer Nature in Journal of Industrial Engineering International
- Vol. 13 (3) , 297-306
Abstract
No abstract availableKeywords
Funding Information
- Amirkabir University of Technology
This publication has 24 references indexed in Scilit:
- The third comprehensive survey on scheduling problems with setup times/costsEuropean Journal of Operational Research, 2015
- An agent-based genetic algorithm for hybrid flowshops with sequence dependent setup times to minimise makespanExpert Systems with Applications, 2012
- Study of stochastic sequence-dependent flexible flow shop via developing a dispatching rule and a hybrid GAEngineering Applications of Artificial Intelligence, 2012
- A novel hybrid meta-heuristic algorithm for a no-wait flexible flow shop scheduling problem with sequence dependent setup timesInternational Journal of Production Research, 2012
- Scheduling a dynamic flexible flow line with sequence-dependent setup times: a simulation analysisInternational Journal of Production Research, 2009
- New dispatching rules for shop scheduling: A step forwardInternational Journal of Production Research, 2000
- Simple priority rule combinations: An approach to improve both flow time and tardinessInternational Journal of Production Research, 1997
- A computational study of heuristics for two-stage flexible flowshopsInternational Journal of Production Research, 1996
- Two-Stage, Hybrid Flowshop Scheduling ProblemJournal of the Operational Research Society, 1988
- Heuristic methods for flexible flow line schedulingJournal of Manufacturing Systems, 1987