Optimal Integer Delay-Budget Assignment on Directed Acyclic Graphs
Authors:
- S. GhiasiSGS. Ghiasi
- A. TakahashiATA. Takahashi
- M. SarrafzadehMSM. Sarrafzadeh
- 26 July 2004
- journal article
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Transactions on Computer-Aided Design of Integrated Circuits and Systems
- Vol. 23 (8) , 1184-1199
Abstract
Excess delay that each component of a design can tolerate under a given timing constraint is referred to as delay budget. Delay budgeting has been widely exploited to improve the design quality in very large scale integrated computer-aided design flow. The objective of the delay-budgeting problem investigated in this paper is to maximize the total delay budget assigned to each node in a directed acyclic graph under a given timing constraint. Due to the discreteness of the timing of the components in the libraries during design-optimization flow, discrete solution for delay budgeting is essential. We present an optimal integer delay-budgeting algorithm. We prove that the problem can be solved optimally in polynomial time. In addition, we look at different extensions of the delay-budgeting problem, such as maximization of weighted summation of delay budgets assigned to the nodes with constraints on the lower and upper bounds on the delay budget allocated to each node. We prove that for both aforementioned extensions, our algorithm can produce an optimal integer solution in polynomial time. Our algorithm is generic and can be applied at different design tasks at different levels of abstraction. We applied our proposed optimal delay-budgeting algorithm in library mapping during datapath synthesis on a field programmable gate array (FPGA) platform, using preoptimized cores of FPGA libraries. For each application, we go through synthesis and place and route stages in order to obtain accurate results. Our optimal algorithm outperforms the zero-slack algorithm (Nair et al. 1989) in terms of area by 10% on average for all applications. In some applications, optimal delay budgeting can speedup runtime of place and route up to two times.Keywords
This publication has 22 references indexed in Scilit:
- Exploiting VLIW schedule slacks for dynamic and leakage energy reduction2005
- On computation and resource management in an FPGA-based computation environment2003
- An efficient methodology for symbolic compaction of analog ICs with multiple symmetry constraints2003
- Timing constraints for correct performance2002
- Power reduction by gate sizing with path-oriented slack calculation2002
- Budget Management with ApplicationsAlgorithmica, 2002
- Min-max placement for large-scale timing optimization2002
- Battery-aware static scheduling for distributed real-time embedded systems2001
- A gate resizing technique for high reduction in power consumption1997
- A delay budgeting algorithm ensuring maximum flexibility in placementIEEE Transactions on Computer-Aided Design of Integrated Circuits and Systems, 1997