Dynamic scheduling for complex engineer-to-order products
- 11 June 2007
- journal article
- research article
- Published by Taylor & Francis in International Journal of Production Research
- Vol. 45 (15) , 3477-3503
Abstract
The current paper considers dynamic production scheduling for manufacturing systems producing products with deep and complex product structures and complicated process routings. It is assumed that manufacturing and assembly processing times are deterministic. Dynamic scheduling problems may be either incremental (where the schedule for incoming orders does not affect the schedule for existing orders) or regenerative (where a new schedule is produced for both new and existing orders). In both situations, a common objective is to minimize total costs (the sum of work-in-progress holding costs, product earliness and tardiness costs). In this research, heuristic and evolutionary-strategy-based methods have been developed to solve incremental and regenerative scheduling problems. Case studies using industrial data from a company that produces complex products in low volume demonstrate the effectiveness of the methods. Evolution strategy (ES) provides better results than the heuristic method, but this is at the expense of significantly longer computation times. It was found that performing regenerative planning is better than incremental planning when there is high interaction between the new orders and the existing orders.Keywords
This publication has 16 references indexed in Scilit:
- Insertion techniques for static and dynamic resource-constrained project schedulingEuropean Journal of Operational Research, 2003
- Using real time information for effective dynamic schedulingEuropean Journal of Operational Research, 2002
- Dynamic scheduling of manufacturing job shops using genetic algorithmsJournal of Intelligent Manufacturing, 2001
- Job shop scheduling with a non-regular objective: A comparison of neighbourhood structures based on a sequencing/timing decompositionInternational Journal of Production Research, 1999
- Resource-constrained project scheduling: Notation, classification, models, and methodsEuropean Journal of Operational Research, 1999
- Rescheduling job shops under random disruptionsInternational Journal of Production Research, 1997
- Heuristics for dynamic job shop scheduling with real-time updated queueing time estimatesInternational Journal of Production Research, 1997
- Production scheduling/rescheduling in flexible manufacturingInternational Journal of Production Research, 1997
- Analysis of periodic and event-driven rescheduling policies in dynamic shopsInternational Journal of Computer Integrated Manufacturing, 1992
- Sequencing with Earliness and Tardiness Penalties: A ReviewOperations Research, 1990