Hybrid flow shop scheduling with precedence constraints and time lags to minimize maximum lateness
- 1 March 2000
- journal article
- Published by Elsevier in International Journal of Production Economics
- Vol. 64 (1-3) , 101-111
Abstract
No abstract availableAll Related Versions
This publication has 11 references indexed in Scilit:
- Scheduling hybrid flowshops to minimize maximum tardiness or maximum completion timeInternational Journal of Production Research, 1996
- Scheduling a two-stage hybrid flowshop with separable setup and removal timesEuropean Journal of Operational Research, 1994
- Addressing the gap in scheduling research: a review of optimization and heuristic methods in production schedulingInternational Journal of Production Research, 1993
- Performance of priority rules in a due date flow shopOmega, 1992
- Flowshop scheduling with set-up, processing and removal times separatedInternational Journal of Production Research, 1991
- Flow Shop Problems with Time LagsManagement Science, 1983
- A heuristic algorithm for the m-machine, n-job flow-shop sequencing problemOmega, 1983
- An Evaluation of Flow Shop Sequencing HeuristicsManagement Science, 1977
- Note—Sequencing n Jobs on m Machines to Minimise Maximum Tardiness: A Branch-and-Bound SolutionManagement Science, 1977
- A Heuristic Algorithm for the n Job, m Machine Sequencing ProblemManagement Science, 1970