Aircraft maintenance workforce schedulingA case study
- 1 June 1999
- journal article
- Published by Emerald Publishing in Journal of Quality in Maintenance Engineering
- Vol. 5 (2) , 78-89
Abstract
This paper describes an actual aircraft maintenance labor scheduling study. The study’s objective is to determine the optimum maintenance workforce schedule to satisfy growing labor requirements with minimum cost. The main recommendation of the study is to switch from a five‐day to a seven‐day workweek for aircraft maintenance workers. A new integer programming formulation, used to obtain an optimum seven‐day work schedule with no increase in workforce size, is presented. In comparison to the existing five‐day schedule, switching to a seven‐day workweek is expected to produce savings of about 13 per cent, or $100,000 annually.Keywords
This publication has 12 references indexed in Scilit:
- An efficient two-phase algorithm for cyclic days-off schedulingComputers & Operations Research, 1998
- Human Factors Training in the Aircraft Maintenance EnvironmentProceedings of the Human Factors and Ergonomics Society Annual Meeting, 1997
- Mathematical programming approaches for the management of maintenance planning and schedulingJournal of Quality in Maintenance Engineering, 1997
- Maintenance manpower modelling for a hospital building complexEuropean Journal of Operational Research, 1997
- Optimal specialization of a maintenance workforceIIE Transactions, 1997
- Effects of Maintenance Human Factors in Maintenance-Related Aircraft AccidentsTransportation Research Record: Journal of the Transportation Research Board, 1996
- Team Training to Improve the Effectiveness of Teams in the Aircraft Maintenance EnvironmentProceedings of the Human Factors and Ergonomics Society Annual Meeting, 1995
- Workforce Allocation in Cyclical Scheduling Problems: A SurveyJournal of the Operational Research Society, 1976
- Workforce Allocation in Cyclical Scheduling Problems: A SurveyOperational Research Quarterly (1970-1977), 1976
- Optimal Scheduiing of Two Consecutive Idle PeriodsManagement Science, 1972