A cutting and scheduling problem in float glass manufacturing
- 25 May 2013
- journal article
- research article
- Published by Springer Nature in Journal of Scheduling
- Vol. 17 (1) , 95-107
Abstract
No abstract availableKeywords
This publication has 7 references indexed in Scilit:
- Optimization of automated float glass linesInternational Journal of Production Economics, 2013
- Hybrid flow shop scheduling: A surveyComputers & Industrial Engineering, 1999
- Performance of scheduling algorithms for no-wait flowshops with parallel machinesEuropean Journal of Operational Research, 1993
- Schedules for a two-stage hybrid flowshop with parallel machines at the second stageInternational Journal of Production Research, 1991
- Sequencing in an Assembly Line with Blocking to Minimize Cycle TimeOperations Research, 1989
- Efficient optimization algorithms for zero-wait scheduling of multiproduct batch plantsIndustrial & Engineering Chemistry Research, 1989
- Incorporating scheduling in the optimal design of multiproduct batch plantsComputers & Chemical Engineering, 1989