The multimode resource constrained multiproject scheduling problem: Alternative formulations
- 7 July 2008
- journal article
- process systems-engineering
- Published by Wiley in AIChE Journal
- Vol. 54 (8) , 2101-2119
Abstract
Tactical management of development pipelines is concerned with the allocation of resources and scheduling of tasks. Though these decisions have to be made in the presence of uncertainty, to make the problem solvable it is customary to use deterministic MILP formulations of the multi‐mode RCMPSP that are reevaluated after important uncertainties are realized. In spite of the major simplifications attained by down‐ playing the stochastic nature of the problem, the curse of dimensionality limits the exact solution of the formulations to very small systems. The curse is mainly caused by 3 factors: the indexing of the task execution modes the indexing of time periods, and the discrete character of the resources. Three models that attempt to overcome these limitations are proposed and compared. Results show that despite the theoretical advantages of the strategies used, the alternative formulations are limited to problems in the same range of applicability of the conventional multi‐mode formulation. © 2008 American Institute of Chemical Engineers AIChE J, 2008Keywords
This publication has 18 references indexed in Scilit:
- Project Scheduling—Theory and PracticeProduction and Operations Management, 2005
- Managing a Portfolio of Interdependent New Product Candidates in the Pharmaceutical IndustryJournal of Product Innovation Management, 2004
- Optimal resource investment and scheduling of tests for new product developmentComputers & Chemical Engineering, 2004
- Simulation‐optimization framework for stochastic optimization of R&D pipeline managementAIChE Journal, 2003
- A simulation‐optimization framework for research and development pipeline managementAIChE Journal, 2001
- Resource-Constrained Scheduling of Tests in New Product DevelopmentIndustrial & Engineering Chemistry Research, 1999
- Resource-constrained project scheduling: Notation, classification, models, and methodsEuropean Journal of Operational Research, 1999
- Project Scheduling1999
- Project scheduling under resource and mode identity constraints: Model, complexity, methods, and applicationEuropean Journal of Operational Research, 1997
- Optimization Models for the Scheduling of Testing Tasks in New Product DevelopmentIndustrial & Engineering Chemistry Research, 1996