Floating Offshore Wind Solutions for the U.S.: Leveraging European Experience from Floater and Mooring EPCI Perspective
Authors:
- 28 April 2025
- conference paper
- Published by Society of Petroleum Engineers (SPE)
Abstract
The United States has set ambitious goals for developing its offshore wind sector, yet significant challenges remain, including supply chain limitations, installation vessel shortages, port infrastructure inadequacies, and technological gaps. In contrast, European nations have gained substantial experience through several flagship projects. This paper explores the challenges and opportunities within the U.S. floating wind market, providing insights and recommendations based on European experience, from a floating system Engineering, Procurement, Construction, and Installation (EPCI) perspective. The development of floating offshore wind systems is inherently complex, requiring meticulous planning and execution across various domains, including wind turbines, floating foundations, mooring systems, power cables, wind turbine integration, and transportation and installation, along with power substation development. This study provides a detailed analysis of floater system development, drawing on the expertise gained during the project EPCI execution. It includes detailed evaluations of hull, mooring and power cable system development and installation, supplemented by market research on global supply chain capacity, material comparisons, and concept selection. The illustrated project offshore Norway demonstrates the use of concrete floaters, with both concrete and steel options offering advantages for the U.S. market. While steel is widely used, it faces supply chain challenges, whereas concrete provides strong potential for local content. The project employs shared anchor technology, reducing seabed disruption and installation efforts. The shared-anchor technique, with its latest development, holds significant potential for U.S. offshore wind in both shallow and deep waters. Meanwhile, the target global demand significantly exceeds current manufacturing capacity. The global supply of mooring chain will meet only about 25% of the required capacity by 2030, excluding the demand from traditional industries like oil and gas. The U.S. also faces a substantial shortfall in installation vessels and port infrastructure. In the project, three major construction sites were utilized. Lessons suggest that consolidating these into a single site in the U.S. could improve efficiency and reduce costs, allowing substructures to move from station to station rather than relocating construction equipment to each unit. Currently the industry has a trend to shift its focus from developing new concepts to prioritizing project execution and practical delivery capabilities. This paper offers insights to the U.S. offshore wind market, grounded in the EPCI experience of major European offshore wind projects. The insights and lessons shared offer valuable guidance for the successful development of future U.S. offshore wind projects.Keywords
This publication has 6 references indexed in Scilit:
- The Cost of Offshore Wind Energy in the United States From 2025 to 20502024
- Nylon Ropes for Mooring of Floating Offshore Wind Turbines: The NYMOOR Project2024
- A New Mooring System for Floating Offshore Wind Turbines: Theory, Design and Industrialization2023
- Serial Production of Floating Wind Concrete Foundations2023
- A Supply Chain Road Map for Offshore Wind Energy in the United States2023
- The Demand for a Domestic Offshore Wind Energy Supply Chain2022