Optimization modeling of multi-skilled resources in prefabrication: Theorizing cost analysis of process integration in off-site construction
Authors:
- Mehrdad ArashpourMehrdad Arashpour
- Vineet KamatVKVineet Kamat
- Yu BaiYu Bai
- Ron WakefieldRWRon Wakefield
- Babak AbbasiBABabak Abbasi
- 1 November 2018
- journal article
- research article
- Published by Elsevier in Automation in Construction
- Vol. 95, 1-9
Abstract
No abstract availableKeywords
This publication has 80 references indexed in Scilit:
- Task assignment considering cross-training goals and due datesInternational Journal of Production Research, 2013
- Optimizing linear project scheduling with multi-skilled crewsAutomation in Construction, 2012
- Augmented heuristic algorithm for multi-skilled resource schedulingAutomation in Construction, 2011
- Resource-constrained scheduling for continuous repetitive projects with time-based production unitsAutomation in Construction, 2009
- A genetic algorithm-based method for scheduling repetitive construction projectsAutomation in Construction, 2009
- Cross-trained versus specialized agents in an inbound call centre: a simulation-based methodology for trade-off analysisJournal of Simulation, 2008
- Using an enhanced scatter search algorithm for a resource-constrained project scheduling problemSoft Computing, 2008
- Enterprise resource planning (ERP) operations support system for maintaining process integrationInternational Journal of Production Research, 2005
- GA-based resource-constrained flow-shop scheduling model for mixed precast productionAutomation in Construction, 2002
- Examination of flexibility acquisition policies in dual resource constrained job shops with simultaneous worker learning and forgetting effectsJournal of the Operational Research Society, 2000