Leagile Strategies for Optimizing the Delivery of Prefabricated House Building Projects
- 1 October 2018
- journal article
- research article
- Published by Taylor & Francis in International Journal of Construction Management
- Vol. 20 (8) , 867-881
Abstract
Australian housing supply has not been responded at a rate commensurate with its growing demand. Residential housing sector is facing this serious shortage issue by actively developing and effectively using new construction material, processes and practices for sustaining its competitive advantage over other construction sectors in the Australian context. The Construction 2020 report confirmed prefabrication/off-site manufacturing (OSM) as a critical vision for the Australian construction industry’s future, as OSM provides opportunities for not only increased productivity and safety, but also decreased cost. It also has the capability of meeting the growing housing demand within the extant level of skilled labour. By combining lean and agile concepts, OSM’s supply responsiveness and efficiency can be intensified. The current research studies the association between demand–supply housing imbalance factors using mixed methods from literature and interviews. Literature has documented four main factors that drive this imbalance: (1) housing completion time; (2) cost of a finished house; (3) customer preferences and (4) level of skilled labour. Interviews with 13 industry professionals identified the four main leagile strategies used to deliver prefabricated building projects. Literature and interview findings supported the development and validation of multicriteria decision-making (MCDM) model comprising and incorporating these factors (and subfactors) and the four leagile strategies. The choice of the appropriate strategy to address the studied factors within the Australian context was optimized using analytic hierarchy process (AHP). The results from the AHP model show the suitability of applying each strategy at different degrees as influenced by the tested factors.Keywords
This publication has 23 references indexed in Scilit:
- on Influence Factors of Wuhan Housing Industry Based on the AHPSystems Engineering Procedia, 2012
- Drivers, constraints and the future of offsite manufacture in AustraliaConstruction Innovation, 2009
- Applicability of lean principles and practices in industrialized housing productionConstruction Management and Economics, 2008
- Application of AHP in improving construction productivity from a management perspectiveConstruction Management and Economics, 2008
- Modeling agility of supply chainIndustrial Marketing Management, 2007
- Building Mass Customised Housing through Innovation in the Production System: Lessons from JapanEnvironment and Planning A: Economy and Space, 2005
- Supply chain migration from lean and functional to agile and customisedSupply Chain Management: An International Journal, 2000
- A methodology for achieving agility in manufacturing organisations: An introductionInternational Journal of Production Economics, 1999
- AN AHP FRAMEWORK FOR PRIORITIZING CUSTOMER REQUIREMENTS IN QFD: AN INDUSTRIALIZED HOUSING APPLICATIONIIE Transactions, 1994
- How to make a decision: The analytic hierarchy processEuropean Journal of Operational Research, 1990