Abstract
The power take-off (PTO) of a wave energy converter (WEC) converts mechanical power extracted from the waves into electrical power. Increasing PTO performance under several operational conditions is therefore essential to reduce the levelized cost of energy of a given wave energy concept and to achieve higher levels of technology readiness. A key task in the WEC design will then be the holistic assessment of the PTO performance in combination with other subsystems. It is hence important that WEC designers are aware of the different modeling options. This paper addresses this need and presents two alternative wave-to-wire modeling approaches based on a 250 kW modular electromechanical PTO coupled to an oscillating wave surge converter (OWSC) device. The first is a detailed and accurate offline model. The second model is a simplified and faster version of the first, being adequate for rapid analyses and real-time (RT) simulation. The paper presents the benchmarking of the offline model against the RT model and the hardware-in-the-loop (HIL) tests of the PTO. The normalized root-mean-square error (NRMSE) is considered as a quantitative indicator for the measurement of real-time and HIL test results against the offline simulation. Results show that the dynamics of the offline model are well represented by the RT model with execution times up to 10 times faster. The offline model also depicts well the behavior observed in the HIL tests with the NRMSE values for the PTO position, velocity, and force above 0.90, which shows the HIL test results replicates with fidelity the dynamic behavior of the complete model. Meaningful differences are however present and highlighted in this paper. An understanding of the advantages and drawbacks of these three approaches is fundamental to properly design a WEC during its project cycle and validate PTO concepts with a certain level of simplification.Keywords
Funding Information
- European Union’s Horizon 2020 Research and Innovation Programme (764066)
- strategic area Oceans of NTNU
This publication has 18 references indexed in Scilit:
- Validating a Wave-to-Wire Model for a Wave Energy Converter—Part II: The Electrical SystemEnergies, 2017
- Validating a Wave-to-Wire Model for a Wave Energy Converter—Part I: The Hydraulic Transmission SystemEnergies, 2017
- Experimental tests on a wave-to-wire pivoted system for wave energy exploitation2017
- A Review of Wave-to-Wire Models for Wave Energy ConvertersEnergies, 2016
- Design of full scale wave simulator for testing Power Take Off systems for wave energy convertersInternational Journal of Marine Energy, 2016
- Testing and control of a power take-off system for an oscillating-water-column wave energy converterRenewable Energy, 2016
- Applied Regression: An Introduction2016
- Analysis and design of a recipracating linear generator for a PTO2014
- Exploring the Potential for Increased Production from the Wave Energy Converter Lifesaver by Reactive ControlEnergies, 2013
- A Robust Field-Weakening Control Strategy for Surface-Mounted Permanent-Magnet Motor DrivesIEEE Transactions on Energy Conversion, 2005