Application of the W̱COBRA/TRAC best-estimate methodology to the AP600 large-break LOCA analysis
Authors:
- Jinzhao ZhangJZJinzhao Zhang
- 1 November 1998
- journal article
- Published by Elsevier in Nuclear Engineering and Design
- Vol. 186 (1-2) , 279-301
Abstract
No abstract availableKeywords
This publication has 2 references indexed in Scilit: