Model test on cutterhead-soil interaction during shield tunneling and its theoretical model
Authors:
- Xiang ShenXSXiang Shen
- Dajun YuanDYDajun Yuan
- Dalong JinDJDalong Jin
- Xiangsheng ChenXCXiangsheng Chen
- Weiping LuoWLWeiping Luo
- Yuansheng PengYPYuansheng Peng
- Kai DuanKDKai Duan
Top Cited Papers
Open Access
- 1 February 2025
- journal article
- research article
- Published by KEAI Publishing in Underground Space
- Vol. 20, 46-68
Abstract
No abstract availableKeywords
This publication has 32 references indexed in Scilit:
- Estimating locations of soil–rock interfaces based on vibration data during shield tunnellingAutomation in Construction, 2023
- Non-linear spring model for backfill grout-consolidation behind shield tunnel liningComputers and Geotechnics, 2021
- Thrust force allocation method for shield tunneling machines under complex load conditionsAutomation in Construction, 2018
- Dynamic load prediction of tunnel boring machine (TBM) based on heterogeneous in-situ dataAutomation in Construction, 2018
- Research on Combined Construction Technology for Cross-Subway Tunnels in Underground SpacesEngineering, 2018
- Modeling of the thrust and torque acting on shield machines during tunnelingAutomation in Construction, 2014
- Modeling and analysis of thrust force for EPB shield tunneling machineAutomation in Construction, 2012
- Determination of the cutterhead torque for EPB shield tunneling machineAutomation in Construction, 2011
- Prediction and field measurements of tillage tool draft forces and efficiency in cohesive soilsSoil and Tillage Research, 1984
- The cutting of soil by narrow bladesJournal of Terramechanics, 1977