Load Scheduling of Multiple Yard Crane Systems in Container Terminal with Buffer Areas
Authors:
- 1 January 2009
- journal article
- research article
- Published by SAGE Publications in Transportation Research Record: Journal of the Transportation Research Board
- Vol. 2097 (1) , 70-77
Abstract
This paper addresses the load scheduling problem of multiple yard crane systems in container terminals with buffer areas. In the problem several yard cranes are used to pick up a sequence of containers for a quay crane. The containers picked up ahead of schedule can be stored in buffer areas until they can be handled by the quay crane. An integer programming model is developed for the problem formulation. In the model the work schedules of different yard cranes are decided simultaneously to minimize the loading time. The yard crane scheduling problem is NP-complete by nature. Therefore a scheduling heuristic is designed to solve the proposed problem. Numerical experiments are conducted to compare the performance of the multiple yard crane systems in container terminals with and without buffer areas.Keywords
This publication has 5 references indexed in Scilit:
- Load scheduling for multiple quay cranes in port container terminalsJournal of Intelligent Manufacturing, 2006
- Crane scheduling in container yards with inter-crane interferenceEuropean Journal of Operational Research, 2005
- Heuristic algorithms for routing yard‐side equipment for minimizing loading times in container terminalsNaval Research Logistics (NRL), 2003
- Analysis and Algorithms for the Transtainer Routing Problem in Container Port OperationsTransportation Science, 2002
- An Optimal Routing Algorithm for a Transfer Crane in Port Container TerminalsTransportation Science, 1999