Company-Level Cash-Flow Management
Author:
- 1 March 1996
- journal article
- research article
- Published by American Society of Civil Engineers (ASCE) in Journal of Construction Engineering and Management
- Vol. 122 (1) , 22-29
Abstract
The importance of cash-flow management, and thus the need for it, is a matter of consensus among researchers and practitioners alike. They all agree about the difficulties in generating automatic cash-flow forecasts at the project level due to such problems as compatability—which is explained in this paper—or the lack of detailed data. At the company level it is even more difficult to forecast cash flow, due to the varying levels of data detail for different projects. The paper begins with a comprehensive background of cash-flow management. It then describes the development of a cash-flow management model for the organizational level, followed by the detailed computer program written on this basis. The system presented here is unique because it manages the cash flow of the company as a whole, it is flexible—accepting projects with varying degrees of detailing levels, it requires no human involvement in cash-flow generation, it is accurate, and it is a typical management tool. The uses of such a tool are also discussed.Keywords
This publication has 7 references indexed in Scilit:
- Cost, Schedule, and Time Variances and IntegrationJournal of Construction Engineering and Management, 1993
- Prototype Integrated Cost and Schedule Control SystemJournal of Computing in Civil Engineering, 1993
- Automated Budgeting for ConstructionProceedings of the 37th International Symposium on Automation and Robotics in Construction (isarc), 1991
- Net cashflow models: Are they reliable?Construction Management and Economics, 1991
- CPM/Cost: An Integrated ApproachJournal of the Construction Division, 1981
- Pre-Estimate Cash Flow AnalysisJournal of the Construction Division, 1977
- Economic Analysis of Housing Construction MethodsJournal of the Construction Division, 1972