Mechanization of static mechanical systems inspection planning process
Author:
- R.M. Chandima RatnayakeRRR.M. Chandima Ratnayake
- 11 May 2015
- journal article
- Published by Emerald Publishing in Journal of Quality in Maintenance Engineering
- Vol. 21 (2) , 227-248
Abstract
Purpose: – The purpose of this paper is to review the evolution of inspection and maintenance (I&M) practices used for aging and newly built oil and gas (O&G) facilities. It also proposes a framework and an approach for mechanizing inspection planning to perform preventive maintenance (PM) activities, taking technical condition (TC) and relative degradation (RD) into consideration. Design/methodology/approach: – The paper systematically collects, categorizes, and analyzes the published literature of both researchers and practitioners. It also utilizes industrial experience that has been accrued and utilized from inspection planning practices for static mechanical equipment on aging O&G production plants. Findings: – The paper defines significant issues in I&M of O&G assets related to: different philosophies; stakeholders’ requirements trade-off; dependability and asset deterioration challenges; items interacting with inspection planning mechanization processes and I&M optimization approaches. A framework is identified to mechanize the inspection planning process in order to reduce the effect arising from human involvement, while improving the effective utilization of data from different sources. The suggested approach improves the quality of an inspection program, while minimizing the variability and cost to the engineering contractors as well as to the owners of O&G facilities. Practical implications: – The mechanization of inspection planning (MIP) is vital to have inspection programs with uniform quality. The currently employed inspection practices face challenges in maintaining uniform quality from one inspection program to another due to the variability present in the planning process, especially among the different inspection planning engineers. The suggested fuzzy logic-based MIP supports the minimization of the variability and increases the quality of inspection programs. Originality/value: – The paper provides a comprehensive review of research contributions and industrial development efforts. These will be useful to the life cycle stakeholders in both academia and industry in understanding the inspection planning problem and solution space within the O&G asset I&M context.Keywords
This publication has 45 references indexed in Scilit:
- Sustainable performance of industrial assets: the role of PAS 55-1&2 and human factorsInternational Journal of Sustainable Engineering, 2013
- Risk-based maintenance strategy and its applications in a petrochemical reforming reaction systemJournal of Loss Prevention in the Process Industries, 2009
- Planning and optimizing the maintenance of paper production systems in a paper plantComputers & Industrial Engineering, 2008
- Prioritizing equipments for preventive maintenance (PM) activities using fuzzy rulesComputers & Industrial Engineering, 2008
- Risk-based maintenance (RBM): a quantitative approach for maintenance/inspection scheduling and planningJournal of Loss Prevention in the Process Industries, 2003
- Reliability modelling of repairable systems using Petri nets and fuzzy Lambda–Tau methodologyReliability Engineering & System Safety, 2001
- Optimizing maintenance and repair policies via a combination of genetic algorithms and Monte Carlo simulationReliability Engineering & System Safety, 2000
- An algorithm for thermal unit maintenance scheduling through combined use of GA, SA and TSIEEE Transactions on Power Systems, 1997
- An expert system for offshore structure inspection and maintenanceComputers & Structures, 1991
- Optimal strategy for inspection and repair of structural systemsCivil Engineering Systems, 1987