A unified heuristic and an annotated bibliography for a large class of earliness–tardiness scheduling problems
- 15 December 2017
- journal article
- research article
- Published by Springer Nature in Journal of Scheduling
- Vol. 22 (1) , 21-57
Abstract
No abstract availableKeywords
All Related Versions
Funding Information
- Conselho Nacional de Desenvolvimento Científico e Tecnológico (131192/2013-2, 234814/2014-4)
- Conselho Nacional de Desenvolvimento Científico e Tecnológico (305223/2015-1)
This publication has 154 references indexed in Scilit:
- Single-machine scheduling to minimize the total earliness and tardiness is strongly NP-hardOperations Research Letters, 2013
- A variable neighborhood search for minimizing total weighted tardiness with sequence dependent setup times on a single machineComputers & Operations Research, 2012
- On heuristic search for the single machine total weighted tardiness problem – Some theoretical insights and their empirical verificationEuropean Journal of Operational Research, 2010
- Non-identical parallel-machine scheduling research with minimizing total weighted completion times: Models, relaxations and algorithmsApplied Mathematical Modelling, 2009
- The time-dependent traveling salesman problem and single machine scheduling problems with sequence dependent setup timesDiscrete Optimization, 2008
- Scheduling jobs on parallel machines with setup times and ready timesComputers & Industrial Engineering, 2008
- A variable neighborhood search for minimizing single machine weighted earliness and tardiness with common due dateComputers & Industrial Engineering, 2007
- Minimizing total flow time in single machine environment with release time: an experimental analysisComputers & Industrial Engineering, 2004
- Greedy Randomized Adaptive Search ProceduresJournal of Global Optimization, 1995
- A branch-and-bound algorithm to minimize total flow time with unequal release datesNaval Research Logistics (NRL), 1992