Optimizing strategy software for repetitive construction projects within multi-mode resources
Open Access
- 30 September 2013
- journal article
- Published by Elsevier in Alexandria Engineering Journal
- Vol. 52 (3) , 373-385
Abstract
No abstract availableKeywords
This publication has 18 references indexed in Scilit:
- Optimizing strategy software for repetitive construction projects within multi-mode resourcesAlexandria Engineering Journal, 2013
- A genetic algorithm-based method for scheduling repetitive construction projectsAutomation in Construction, 2009
- A two-phase GA model for resource-constrained project schedulingAutomation in Construction, 2009
- A random key based genetic algorithm for the resource constrained project scheduling problemComputers & Operations Research, 2009
- Genetic algorithm-based multi-objective model for scheduling of linear construction projectsAdvances in Engineering Software, 2008
- Handling construction pollutions using multi‐objective optimizationConstruction Management and Economics, 2008
- A framework to minimise total energy consumption and total tardiness on a single machineInternational Journal of Sustainable Engineering, 2008
- A hybrid mechanism for optimizing construction simulation modelsAutomation in Construction, 2005
- Comparison among five evolutionary-based optimization algorithmsAdvanced Engineering Informatics, 2005
- Genetic algorithms in search, optimization, and machine learningChoice Reviews Online, 1989