The integration of variable renewable energy sources in islands has become crucial in reducing their dependency on imported fossil fuels. This study aims to assess the energy transition of an island towards a 100% renewable energy system for power generation, inland transport, and potable water provision. Linking various fossil fuel consuming sectors, such as transport and potable water supply system, may strongly assist in reducing the possible mismatch between RES production and demand and contributing to fulfilling other system’s requirements. The use of energy storage technologies is vital and unlike traditional power systems, as the number of components in the system increases, their proper capacity needs to be accurately determined. This work employs a multi-objective optimization assessment using a modified NSGA-II algorithm to depict the energy transition for Porto Santo Island. To evaluate the solutions, we considered the main criteria of energy cost, Avoided environmental impacts (CO2 equivalent emission) of the proposed system, and energy security for 25 years. The Pareto Front contains various solutions under different system configurations. Results indicate that full inland transport electrification (introducing 3,000 EVs) can account for 18% of the avoided CO2 emissions of the island while shares 28%-40% of the up-front cost of the system. Another interesting finding from the optimization process is that the solution with the highest avoided CO2 emissions involves keeping the diesel generator for supplying 4% of the island's total demand and using a UW-CAES with a capacity of 280 MWh. This suggests that adding more installed wind turbines or PV panels may not necessarily contribute to reducing the emissions of the entire system.