Quay-Yard operation analysis of port container terminals in Nigeria
Open Access
- 2 November 2022
- journal article
- research article
- Published by University of Nigeria in Nigerian Journal of Technology
- Vol. 41 (4) , 670-679
Abstract
This paper presents significant measures to tackling berth occupancy and quay-yard operation problems. Case study was conducted on a port container terminal in Nigeria confidentially identified as ‘Port A’ in this paper. Hungarian assignment algorithm was used to reduce the total travel time of the yard trucks from an average of 6.4 minutes to 3.5minutes, while M/M/c/K queuing model was applied in scheduling the quay crane assignments. Results showed tremendous increase in quay crane rate, berth capacity and improved berth utilization. Also, for the reach stacker, the crane rate can be improved to 30 TEUs/hr at berth occupancy below 0.40 with TEUs factor of 1.4. These results imply that for Nigeria terminals operating with reach stacker crane, it is possible to improve the berth capacity without affecting the berth utilization of the terminal.Keywords
This publication has 32 references indexed in Scilit:
- Scheduling of collaborative operations of yard cranes and yard trucks for export containers using hybrid approachesAdvanced Engineering Informatics, 2021
- Model predictive control for simultaneous planning of container and vehicle routesEuropean Journal of Control, 2021
- Scheduling of container-handling equipment during the loading process at an automated container terminalComputers & Industrial Engineering, 2020
- Vehicle routing problem and related algorithms for logistics distribution: a literature review and classificationOperational Research, 2020
- A comprehensive review of quay crane scheduling, yard operations and integrations thereof in container terminalsFlexible Services and Manufacturing Journal, 2020
- Optimal strategies for the yard truck scheduling in container terminal with the consideration of container clustersComputers & Industrial Engineering, 2019
- Scheduling appointments for container truck arrivals considering their effects on congestionFlexible Services and Manufacturing Journal, 2019
- Yard crane scheduling problem in a container terminal considering risk caused by uncertaintyAdvanced Engineering Informatics, 2019
- Scheduling quay cranes and yard trucks for unloading operations in container portsAnnals of Operations Research, 2016
- Fleet sizing and vehicle routing for container transportation in a static environmentOR Spectrum, 2004