Decentralized and Centralized Planning for Multi-Robot Additive Manufacturing
- 10 October 2022
- journal article
- research article
- Published by Wiley in Journal of Mechanical Design
- Vol. 145 (1)
Abstract
In this paper, we present a decentralized approach based on a simple set of rules to schedule multi-robot cooperative additive manufacturing (AM). The results obtained using the decentralized approach are compared with those obtained from an optimization-based method, representing the class of centralized approaches for manufacturing scheduling. Two simulated case studies are conducted to evaluate the performance of both approaches in total makespan. In the first case, four rectangular bars of different dimensions from small to large are printed. Each bar is first divided into small subtasks (called chunks), and four robots are then assigned to cooperatively print the resulting chunks. The second case study focuses on testing geometric complexity, where four robots are used to print a mask stencil (an inverse stencil, not face covering). The result shows that the centralized approach provides a better solution (shorter makespan) compared to the decentralized approach for small-scale problems (i.e., a few robots and chunks). However, the gap between the solutions shrinks while the scale increases, and the decentralized approach outperforms the centralized approach for large-scale problems. Additionally, the runtime for the centralized approach increased by 39-fold for the extra-large problem (600 chunks and four robots) compared to the small-scale problem (20 chunks and four robots). In contrast, the runtime for the decentralized approach was not affected by the scale of the problem. Finally, a Monte-Carlo analysis was performed to evaluate the robustness of the centralized approach against uncertainties in AM. The result shows that the variations in the printing time of different robots can lead to a significant discrepancy between the generated plan and the actual implementation, thereby causing collisions between robots that should have not happened if there were no uncertainties. On the other hand, the decentralized approach is more robust because a collision-free schedule is generated in real-time.Keywords
Funding Information
- National Science Foundation (2112009)
This publication has 23 references indexed in Scilit:
- Path Planning with Loop Closure Constraints Using an Atlas-Based RRT2016
- Intractability of Optimal Multirobot Path Planning on Planar GraphsIEEE Robotics and Automation Letters, 2015
- Designing Collective Behavior in a Termite-Inspired Robot Construction TeamScience, 2014
- A Comparative Study between Optimization and Market-Based Approaches to Multi-Robot Task AllocationAdvances in Artificial Intelligence, 2013
- A genetic algorithm with tabu search procedure for flexible job shop scheduling with transportation constraints and bounded processing timesComputers & Operations Research, 2012
- Integration of process planning and scheduling—A modified genetic algorithm-based approachComputers & Operations Research, 2009
- Three-Dimensional Construction with Mobile Robots and Modular BlocksThe International Journal of Robotics Research, 2008
- Soccer robot path planning based on the artificial potential field approach with simulated annealingRobotica, 2004
- Static scheduling algorithms for allocating directed task graphs to multiprocessorsACM Computing Surveys, 1999
- A Tabu Search Heuristic for the Vehicle Routing ProblemManagement Science, 1994