Intelligent Optimization of Tower Crane Location and Layout Based on Firefly Algorithm
Authors:
Open Access
- 29 June 2022
- journal article
- research article
- Published by Wiley in Computational Intelligence and Neuroscience
- Vol. 2022, 1-13
Abstract
The existing tower crane positioning layout mainly depends on the experience of construction personnel, and the best tower crane positioning can be found through a large number of manual data calculation. This manual method is time-consuming and impractical. In view of this, aiming at the current situation that building information modeling (BIM) software can only obtain the relative coordinates of components, this article puts forward the key technology of importing computer-aided design (CAD) graphics into geographic information system (GIS) software to automatically obtain the world coordinate information. By clarifying the transfer relationship between the component material supply point, the component initial positioning point, and the tower crane optional positioning point, as well as the cooperative relationship between each positioning point and the tower crane operation, the tower crane positioning optimization model is formed, and the firefly algorithm is used to automatically calculate and generate the best positioning layout method of the tower crane on the project site. In this study, the vertical transportation and positioning of components are studied, and intelligent construction is formed by integrating information technology. It can further enrich the functions of perception, analysis, decision-making, and optimization; realize the decision-making intelligence of industrial buildings; and achieve the organic unity of engineering construction execution system and decision-making command system.Keywords
Funding Information
- Jiangsu Provincial Double-Innovation Doctor Program (JSSCBS20210394)
This publication has 30 references indexed in Scilit:
- Decision support for tower crane selection with building information models and genetic algorithmsAutomation in Construction, 2016
- A BIM-based approach for automated tower crane layout planningAutomation in Construction, 2015
- Particle bee algorithm for tower crane layout with material quantity supply and demand optimizationAutomation in Construction, 2014
- Optimum Tower Crane Selection and Supporting Design ManagementInternational Journal of Advanced Robotic Systems, 2014
- Optimization of tower crane and material supply locations in a high-rise building site by mixed-integer linear programmingAutomation in Construction, 2011
- Coordinate Systems and Transformations2011
- Firefly algorithm, stochastic test functions and design optimisationInternational Journal of Bio-Inspired Computation, 2010
- Genetic Algorithm for Optimizing Supply Locations around Tower CraneJournal of Construction Engineering and Management, 2001
- Communicating Geographic Information in a Digital AgeAnnals of the American Association of Geographers, 2000
- Location Optimization for a Group of Tower CranesJournal of Construction Engineering and Management, 1999