Abstract
Theory-based studies claim that informal processes interfere with the formal mechanisms and structures of projects in the construction sector. These processes structure and transform multi-organizations. This four-year case study reveals empirical evidence about how processes effectively evolve over time and affect formal mechanisms and structures. The results show: (1) the significant differences between what is planned and what actually unfolds in project processes; (2) how iterative processes overshadow linear ones; (3) how informality and “iterativity” eventually end up as self-, eco-, and re-organizing projects and organizations, confirming that projects (re)create the very processes and structures that initiate them.Keywords
This publication has 42 references indexed in Scilit:
- The core of ‘design thinking’ and its applicationDesign Studies, 2011
- Structuring of Temporary Multi-Organizations: Contingency Theory in the Building SectorProject Management Journal, 2011
- Relations intra- and inter-organisations for the study of the temporary multi-organisation in construction projectsInternational Journal of Project Organisation and Management, 2011
- The case for “3D triangulation” when applied to construction management researchConstruction Innovation, 2010
- Methodological strategies to gain insights into informality and emergence in construction project case studiesConstruction Management and Economics, 2009
- Organizations as Distinction Generating and Processing Systems: Niklas Luhmann’s Contribution to Organization StudiesOrganization, 2006
- The unmanageability of construction and the theoretical psycho-social dynamics of projectsEngineering, Construction and Architectural Management, 2002
- Rethinking construction: the Generic Design and Construction Process ProtocolEngineering, Construction and Architectural Management, 2000
- Project complexity: The focal point of construction production planningConstruction Management and Economics, 1996