Abstract
Purpose: – Tight schedules in high-rise building construction force project managers to use the formwork even in a bad weather condition. Insufficient craning, which is typically the bottleneck in construction activities, and lack of space in confined sites make it hard to install the formwork on the ground. The Automatic Climbing System (ACS), a type of jump forms, solves these problems enabling the formwork to climb in various weather and height conditions. The aim of this paper is to discuss these issues. Design/methodology/approach: – Current research focusses on the ACS, its application, and productivity assessment. Productivity and construction data are collected from a specialized company in such type of forms. A bracket productivity model has been developed to estimate floor construction cycle time and productivity. Findings: – Results show that average productivity is four days/floor. The developed model is validated, which shows robust results 97.80 percent. Research limitations/implications: – The implementation of the developed models are limited to only two projects. However, the developed models and framework is sound for future improvement. Practical implications: – The developed methodology and model play essential roles in decision-making process. Originality/value: – The developed methodology and model are beneficial to researchers, practitioners, and planners of construction projects. It provides practitioners with charts that assist in scheduling and managing resources for jump form application. In addition, it provides researchers with a floor cycle time model and framework of implementing jump forms to high-rise buildings.Keywords
This publication has 7 references indexed in Scilit:
- Selection of slab formwork system using fuzzy logicConstruction Management and Economics, 2011
- Revisiting the applicability of learning curve theory to formwork labour productivityConstruction Management and Economics, 2011
- Slip-Form Application to Concrete StructuresJournal of Construction Engineering and Management, 2008
- Selection of vertical formwork system by probabilistic neural networks modelsConstruction Management and Economics, 2005
- Concrete Formwork Systems1998
- Neuroform—Neural Network System for Vertical Formwork SelectionJournal of Computing in Civil Engineering, 1992
- Knowledge Acquisition and Development for Formwork Selection SystemJournal of Construction Engineering and Management, 1992