In order to solve the problems of stress concentration and large deformation of surrounding rock of secondary gob-side entry retaining in thin coal seam caused by hard overhanging roof, the method of cutting off overhanging roof on both sides of roadway by manual pre-cutting seam is adopted. It can transfer high stress to goaf on both sides of roadway and reduce roadway deformation. The mechanism of roadway formation, the conditions of double side overhanging roof subsidence and the stress reduction of roadway side support of secondary gob-side entry retaining after double side roof cutting are given. This paper studies the pressure relief law of secondary gob side entry retaining after double side roof cutting in thin coal seam. After double side roof cutting, the stress of roadway side support is reduced by 76%, the maximum vertical displacement of roof is reduced by 84%, and high stress is transferred to goaf. The influence of different double side roof cutting thickness and angle on the pressure relief effect is analyzed. On the premise that the collapsed gangue can fill the goaf, the smaller the thickness of double side roof cutting is, the better the pressure relief effect is, and the greater the double side roof cutting angle is, the better the pressure relief effect is. It has been successfully applied in the left five roadway of No. 69 coal seam in Xinqiang coal mine, and the deformation of roof and floor is reduced by 47% and the deformation of two sides is reduced by 56% after double side roof cutting. It has important reference value for the future secondary gob-side entry retaining.Keywords
This publication has 15 references indexed in Scilit:
- Control mechanism of roof fracture in no-pillar roadways automatically formed by roof cutting and pressure releasingArabian Journal of Geosciences, 2020
- Case study on pressure-relief mining technology without advance tunneling and coal pillars in longwall miningTunnelling and Underground Space Technology, 2020
- Longwall mining method with roof-cutting unloading and numerical investigation of ground pressure and roof stabilityArabian Journal of Geosciences, 2018
- Principles of the roof cut short-arm beam mining method (110 method) and its mining-induced stress distributionInternational Journal of Mining Science and Technology, 2018
- The reasonable breaking location of overhanging hard roof for directional hydraulic fracturing to control strong strata behaviors of gob-side entryInternational Journal of Rock Mechanics and Mining Sciences, 2018
- Failure mechanism of surrounding rock with high stress and confined concrete support systemInternational Journal of Rock Mechanics and Mining Sciences, 2018
- Optimization of hard roof structure over retained goaf-side gateroad by pre-split blasting technologyInternational Journal of Rock Mechanics and Mining Sciences, 2017
- Field and numerical investigations of gateroad system failure induced by hard roofs in a longwall top coal caving faceInternational Journal of Coal Geology, 2017
- Response and control technology for entry loaded by mining abutment stress of a thick hard roofInternational Journal of Rock Mechanics and Mining Sciences, 2016
- Long-hole destress blasting for rockburst control during deep underground coal miningInternational Journal of Rock Mechanics and Mining Sciences, 2013