Job-shop scheduling problem considering power cost and makespan under time-of-use electricity price
Authors:
- 11 November 2019
- journal article
- research article
- Published by European Society of Computational Methods in Sciences and Engineering in Journal of Computational Methods in Sciences and Engineering
- Vol. 19 (4) , 929-941
Abstract
In order to solve the problem of minimizing power cost and makespan with time-of-use electricity. A genetic algorithm based on individual concentration and similarity vector distance strategy is proposed. The proposed genetic algorithm overcomes premKeywords
This publication has 4 references indexed in Scilit:
- Hybrid flow shop scheduling considering machine electricity consumption costInternational Journal of Production Economics, 2013
- Energy Forecast Model Based on Combination of GM(1,1) and Neural Network2009
- A fuzzy logic approach to forecast energy consumption change in a manufacturing systemExpert Systems with Applications, 2008
- A SURVEY OF ALGORITHMS FOR SINGLE AND MULTI-OBJECTIVE UNRELATED PARALLEL-MACHINE DETERMINISTIC SCHEDULING PROBLEMSJournal of the Chinese Institute of Industrial Engineers, 2004