Multi-item, single-machine scheduling problem with stochastic demands: a comparison of heuristics
Authors:
- 1 March 1994
- journal article
- research article
- Published by Taylor & Francis in International Journal of Production Research
- Vol. 32 (3) , 583-596
Abstract
This paper discusses the results of simulation tests for multi-item, single-machine production systems facing stochastic, time-varying demands. Six different heuristics are compared with the objective of minimizing the sum of changeover and inventory costs. Tests are performed to evaluate the effect of the stationarity of the demand process and of the level of forecast errors on the performance of the heuristics tested.Keywords
This publication has 17 references indexed in Scilit:
- Note: An Improvement to the Dynamic Cycle Lengths Heuristic for Scheduling the Multi-Item, Single-MachineManagement Science, 1991
- Scheduling Economic Lot Size Production RunsManagement Science, 1990
- The discrete lot-sizing and scheduling problemEuropean Journal of Operational Research, 1990
- A Heuristic Scheduling Policy for Multi-Item, Single-Machine Production Systems with Time-Varying, Stochastic DemandsManagement Science, 1988
- A Dynamic Programming Solution to the Dynamic, Multi-Item, Single-Machine Scheduling ProblemOperations Research, 1988
- OR Practice—Determining Lot Sizes and Resource Requirements: A ReviewOperations Research, 1987
- The Economic Lot Scheduling Problem (ELSP): Review and ExtensionsManagement Science, 1978
- An Iterative Procedure for the Single-Machine Multi-Product Lot Scheduling ProblemManagement Science, 1973
- Lot Size Scheduling on a Single Machine for Stochastic DemandManagement Science, 1973
- Inventory control of a multiproduct system with a limited production resourceNaval Research Logistics Quarterly, 1967